TCT received contract from Metso Minerals South Africa to supervise the assembly of 15 ton / 9 MW Inductotherm medium frequancy Induction Melting System at their foundry in Isithebe near Durban, S. Africa.
TCT supplied this used Melting Plant from a reputed German foundry. TCT dismantled, packed and shipped the equipment by its team.
TCT deputed two of its experienced supervisors to Isithebe. This project is headed by TCT Service manager Mr. Tobias Manka.